Set up a three-viewport workspace.
Set up a four-viewport workspace.
Create a new viewport.
Create a new free-floating viewport.
Toggle the viewport between docked and floating.
Set the viewport layout to match that of another model.
Maximize the active viewport.
Close the active viewport.
SetActiveViewport
Activate a named viewport.
SetMaximizedViewport
Maximize a named viewport inside the application window.
NextViewport
Activate the next viewport.
NextOrthoViewport
Activate the next viewport with an orthogonal projection.
NextPerspectiveViewport
Activate the next viewport with a perspective projection.
PrevViewport
Activate the previous viewport.
BringViewportToTop
Bring a viewport to the front.
NextViewportToTop
Display the next viewport in front of all other viewports.
PushViewportToBack
Send a named viewport behind all viewports.
Divide a viewport horizontally into two viewports.
Divide a viewport vertically into two viewports.
Title, size, projection, camera and target, lens length, wallpaper.
Display a tab control UI along the viewport edge.
Fullscreen
Hide menus, status bar, toolbars, command prompt, and windows title bar and maximize the Rhino window.
Minimize
Minimize the Rhino application window.
Maximize
Maximize the Rhino application window.
Restore
Restore the application window from being maximized.
Rhinoceros 6 © 2010-2020 Robert McNeel & Associates. 11-Nov-2020